New Wetland Lagoon Wastewater Treatment Improvements
Closed · Kansas · Last reported Jan 2025
Source: Dodge
the Wastewater Treatement Improvements consisting of construction of one new wetland lagoon cell with approximately 13,000 C.Y. ofCut raw and 200 C.Y. Fill raw, installation of riprap armoringapproximately 146 tons, 615 LF of 10 SDR 35 PVC transfer and emergencydischarge piping, connections to existing sewer line, construction of one emergency discharge piping headwall, existing structure demoliti
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
- Location
- Olsburg, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Wetland Lagoon Wastewater Treatment Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the Wastewater Treatement Improvements consisting of construction of one new wetland lagoon cell with approximately 13,000 C.Y. ofCut raw and 200 C.Y. Fill raw, installation of riprap armoringapproximately 146 tons, 615 LF of 10 SDR 35 PVC transfer and emergencydischarge piping, connections to existing sewer line, construction of one emergency discharge piping headwall, existing structure demolition, constructionof new control/distribution structures and piping, lagoon biosolids removal,trans... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Olsburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
