New WRRF GBT Expansion (3rd Unit)
Sector: Water Supply and Storage • Location: Hayward, California, United States of America
Source: Dodge
Construction of a new 3rd Gravity Belt Thickner (GBT) at the WRRF as part of upgrades to COH's biosolids program. As part of the treatment process blended sludge is fed to the GBT's for thickening. The two existing GBTs at the plant were installed in 2009 and are considered to be in good condition
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a new 3rd Gravity Belt Thickner (GBT) at the WRRF as part of upgrades to COH's biosolids program. As part of the treatment process blended sludge is fed to the GBT's for thickening. The two existing GBTs at the plant were installed in 2009 and are considered to be in good condition |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
