Newark Liberty International Airport Guideway and Stations Project
Sector: Power Generation (CCGT) • Location: New Jersey, (USA) United States of America
Source: InfraPPPWorld
The project involves the replacement of the existing AirTrain system with the new AirTrain at Newark Liberty International Airport in New Jersey, USA.The existing system is reaching its life expectancy and cannot accommodate the current passenger demand and future needs of the airport. The new AirTrain Newark will provide for a completely new Right-of-Way (ROW) in a revised alignment to meet the c
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the replacement of the existing AirTrain system with the new AirTrain at Newark Liberty International Airport in New Jersey, USA.The existing system is reaching its life expectancy and cannot accommodate the current passenger demand and future needs of the airport. The new AirTrain Newark will provide for a completely new Right-of-Way (ROW) in a revised alignment to meet the changing Airport layout. The project will be a 2.5-mile elevated guideway train system and will be designed to maximize customer convenience with seamless connections to other forms of transportation and provide modern tools and amenities in AirTrain stations and vehicles. The expected operation rate is 2,000-3,500 passengers per hour per direction. In addition to the guideway, the following infrastructure will be constructed or provided:3 stations;Maintenance Control Facility;Grade-separated pedestrian connections from stations to terminals;15-20 vehicles;Power distribution system including substations;Automated train control system; andSupervisory control and data acquisition systems. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
