Newburg Water System Improvements
Sector: Water Supply and Storage • Location: Newburg, Missouri, United States of America
Source: Dodge USA
The Proposed Work Includes:The demolition of the existing concrete ground storage tank and replacement with a new 75,000 gallon bolted steel tank; Well House #1 floor slabrepair, chemical contact tank removal, roof replacement, and yard piping modifications; replacement of approximately 7,500 lineal feet of old 6 cast iron mains, HDD installation of approximately 900 feet of 2 water main, asphalt
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Road, Commercial, Raw Materials, Manufacturing (Industrial), Government, Cement, Consumer Products, Steel, Metal
- Location
- Newburg, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Newburg Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Proposed Work Includes:The demolition of the existing concrete ground storage tank and replacement with a new 75,000 gallon bolted steel tank; Well House #1 floor slabrepair, chemical contact tank removal, roof replacement, and yard piping modifications; replacement of approximately 7,500 lineal feet of old 6 cast iron mains, HDD installation of approximately 900 feet of 2 water main, asphalt patching and repair, and miscellaneous repairs at Tank #2 andWell House #2. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Newburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Road, Commercial, Raw Materials, Manufacturing (Industrial), Government, Cement, Consumer Products, Steel, Metal |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
