Newcastle Pump Station Upgrade REBID
Sector: Commercial • Location: Newcastle, Wyoming, United States of America
Source: Dodge USA
This Project consists of furnishing and installing an ICF building addition with electrical and mechanical systems, installing interior steel piping with connection to existing water main, piping modifications for installing a new control valve, piping modifications and replacing an existing pump and motor, chlorination system, upflow propeller meter, electrical instrumentation and controls, PVC f
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Steel, Waste Processing and Treatment, Government, Metal, Manufacturing (Industrial)
- Location
- Newcastle, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Newcastle Pump Station Upgrade REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project consists of furnishing and installing an ICF building addition with electrical and mechanical systems, installing interior steel piping with connection to existing water main, piping modifications for installing a new control valve, piping modifications and replacing an existing pump and motor, chlorination system, upflow propeller meter, electrical instrumentation and controls, PVC floor drain with connection to existing sewer main, crushed base surfacing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Newcastle |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Steel, Waste Processing and Treatment, Government, Metal, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
