Newcom Salkhit Wind Farm
Active · Ulaanbaatar
Source: World Bank Group
Clean Energy LLC was created in order to build, own and operate a 50 MW wind farm to be located in Ulaanbaatar, Mongolia. the project company was a joint venture between the European Bank for Reconstruction and Development (EBRD) 25%, and the Mongolian firm the Newcom Group.
Details from public sources on the Power Purchase Agreement were not available, but various sources did state that the p
- Status
- Prospective
- Sector
- Commercial, Wind, Power Generation (CCGT), Raw Materials, Government
- Location
- Ulaanbaatar, Mongolia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Newcom Salkhit Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clean Energy LLC was created in order to build, own and operate a 50 MW wind farm to be located in Ulaanbaatar, Mongolia. the project company was a joint venture between the European Bank for Reconstruction and Development (EBRD) 25%, and the Mongolian firm the Newcom Group. Details from public sources on the Power Purchase Agreement were not available, but various sources did state that the project would sell power to the Mongolian grid through a 26 year PPA. In November 2011, GE was selected as the equipment supplier. Leighton Asia was an EPC contractor. Commissioning was expected for April 2013. Total project cost was estimated at USD 120 million. The EBRD invested USD 5 million in SPV Clean Energy LLC. Total debt was US$ 84 million with 15 year tenor, provided in equal portions by EBRD and FMO (US$ 42 million each). Legal advsiser to the lender was Norton Rose, and GTS. Legal adviser to the sponsor was DLA Piper. http://www.ebrd.com/english/pages/project/psd/2012/38344.shtml http://www.genewscenter.com/Press-Releases/GE-Taps-Growth-in-Mongolia-by-Powering-Nation-s-First-Wind-Farm-Project-34f4.aspx |
Original sector | Energy |
Budget |
Location
Country | Mongolia |
State | Ulaanbaatar |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Power Generation (CCGT), Raw Materials, Government |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Mongolia
- Tsetsii Wind Farm
- Sermsang Khushig Khundii Solar PV Power Plant
- Desert Solar Power
- FIF - CA YiB - Transcapital Youth in Business loan II
- Trade and Development Bank
- Altanbulag (Selenge)-Ulaanbaatar-Zamiin Uud (Dornogovi) Highway Project
- Pilot-Testing Climate-Resilient Solutions to Pasture Degradation with Nomadic Herder Groups
- Promoting Finance Sector Development
