NEWCON 40 Malvern ST
Sector: Commercial • Location: Allston, Massachusetts, United States of America
Source: City of Boston
Amend ERT274011: Replace 44" wide section of green roof plantings with 44" paver pathway around perimeter of roof inside parapet wall, as requested by Boston Fire Department to create safe and level walking surface in the event of an emergency. Changes are shown on revised drawing A1.3. There is no cost associated with this change.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about NEWCON 40 Malvern ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Amend ERT274011: Replace 44" wide section of green roof plantings with 44" paver pathway around perimeter of roof inside parapet wall, as requested by Boston Fire Department to create safe and level walking surface in the event of an emergency. Changes are shown on revised drawing A1.3. There is no cost associated with this change. |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
