Newman Bulkhead Dock Pier
Planning schematics · Washington · Last reported Sep 2025
Source: Dodge
Gabion basket bulkhead will be replaced with cornerstone block bulkhead. ATF permits for the replacement of the pier/overwater deck and ramp. Structure has piling/footing in water so is considered a pier/ Portion of the deck level with the house until the steps down is considered deck. No work done or proposed on floating dock. (ENF2023-00059)
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial
- Location
- Shelton, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Newman Bulkhead Dock Pier
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Gabion basket bulkhead will be replaced with cornerstone block bulkhead. ATF permits for the replacement of the pier/overwater deck and ramp. Structure has piling/footing in water so is considered a pier/ Portion of the deck level with the house until the steps down is considered deck. No work done or proposed on floating dock. (ENF2023-00059) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Shelton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
