Newport Beach Via Lido Sewer Main Lining
Sector: Water Supply and Storage • Location: Newport Beach, California, United States of America
Source: Dodge
The work necessary for the completion of this contract consists of furnishing and installing 520 lineal feet of water cured-in-place pipe within the existing 15-inch VCP sewer pipeline along Via Lido between Newport Boulevard and Via Oporto. The work includes providing and setting up traffic control, providing and running the Sewer bypass system, performing pre and post CCTV inspection, cleaning a
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Consumer Products, Government, Commercial
- Location
- Newport Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Newport Beach Via Lido Sewer Main Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work necessary for the completion of this contract consists of furnishing and installing 520 lineal feet of water cured-in-place pipe within the existing 15-inch VCP sewer pipeline along Via Lido between Newport Boulevard and Via Oporto. The work includes providing and setting up traffic control, providing and running the Sewer bypass system, performing pre and post CCTV inspection, cleaning and inspecting the host pipe, liner installation and curing, removing excess resin, fabric and re-... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Newport Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Consumer Products, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
