Newtown Pike (KY 922) Widening Project
Sector: Road • Location: Lexington, Kentucky, United States
Source: The Lexington Times
The project involves widening Newtown Pike from New Circle Road to Interstate 75 by adding one lane in each direction to improve safety and traffic flow. It also includes improvements to the Legacy Trail and drainage pipe installation.
- Status
- Under Construction
- Sector
- Road
- Location
- Lexington, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- The Lexington Times
ConstructChat
Ask ConstructChat about Newtown Pike (KY 922) Widening Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves widening Newtown Pike from New Circle Road to Interstate 75 by adding one lane in each direction to improve safety and traffic flow. It also includes improvements to the Legacy Trail and drainage pipe installation. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Lexington |
Source
Source | The Lexington Times |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
