logo
ProjectEnded

next Generation AutomotIve membrane electrode Assemblies

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

GAIA has the overall aim of developing high power and high current density automotive MEAs well beyond the current state of the art up to TRL5. This project, encompassing OEMs, leading industrial and academic/research organisation/research institute partners with long expertise in fuel cell science and technology, and building on best developments from the FCHJU, will not only provide significantl

Status
Closed
Sector
Power Generation (CCGT), Commercial, Hydrogen, Manufacturing (Industrial), Education, Automotive
Location
France, Germany, United Kingdom, Czechia
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about next Generation AutomotIve membrane electrode Assemblies

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “next Generation AutomotIve membrane electrode Assemblies” is an infrastructure initiative in the Power Generation (CCGT) sector, located in France, Germany, United Kingdom, Czechia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GAIA has the overall aim of developing high power and high current density automotive MEAs well beyond the current state of the art up to TRL5. This project, encompassing OEMs, leading industrial and academic/research organisation/research institute partners with long expertise in fuel cell science and technology, and building on best developments from the FCHJU, will not only provide significantly higher performance MEAs but will also ensure the designs satisfy the cost, durability and operational targets set by the call. Accordingly, the specific objectives of the project are to: - Develop world-leading components (electrocatalysts, membranes, gas diffusion and microporous layers) and improve the interfaces between them to minimise resistances; - Realise the potential of these components in next generation MEAs showing a step-change in performance that will largely surpass the state of the art by delivering a beginning of life power density of 1.8 W/cm2 at 0.6 V; - Validate the MEA performance and durability in full size cell short stacks, with durability tests of 1000 h with extrapolation to 6,000 h; - Provide a cost assessment study that demonstrates that the MEAs can achieve the cost target of 6 €/kW for an annual production rate of 1 million square metres.

Location

Country

France, Germany, United Kingdom, Czechia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Hydrogen, Manufacturing (Industrial), Education, Automotive

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project