logo

NEXT generation methods, concepts and solutions for the design of robust and sustainable running GEAR

Sector: Education • Location: Belgium, Sweden, United Kingdom, Italy, Austria, Spain, Romania

Source: EU Funding & Tenders Portal

Project
Ended

The rail sector has recently seen only limited changes in running gear.The rail sector has recently seen only limited changes in running gear. A reason is that innovations have the tendency to increase the first cost of the running gear while they reduce the LCC by reduce maintenance costs. The long-term cost reduction, however, is not easy to quantify. This dilemma will be addressed in WP1 where

Project Information FAQ

Project Information

3 Q
The project “NEXT generation methods, concepts and solutions for the design of robust and sustainable running GEAR” is an infrastructure initiative in the Education sector, located in Belgium, Sweden, United Kingdom, Italy, Austria, Spain, Romania. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The rail sector has recently seen only limited changes in running gear.The rail sector has recently seen only limited changes in running gear. A reason is that innovations have the tendency to increase the first cost of the running gear while they reduce the LCC by reduce maintenance costs. The long-term cost reduction, however, is not easy to quantify. This dilemma will be addressed in WP1 where an updated Universal Cost Model based on the one from the Roll2Rail project will be developed that makes it possible to judge the economic impact of the innovation suggested for an operator using the vehicle. How can the costs for buying, operating and maintaining the vehicle be influenced? Lower bogie weight would reduce wheel-rail forces and allow for higher payload. In WP2, the project is going to suggest ideas that are based both on the use of new materials and new manufacturing methods. Simulation techniques will be explored to allow optimisation of designs. It will be investigated whether required properties of the running gear such as stiffness and damping could be distributed through the structure rather than requiring specific components. In parallel, active control strategies will be investigated to improve the level of ride comfort or reduce wheel and rail damage. The wheelset is another extremely important and safety-critical component in a rail vehicle. Since it represents a so-called “unsuspended mass” there is a desire to minimize the wheelset weight. The main objective of WP3 is a feasibility study on the use of composite materials for the construction of railway wheelsets. Technology concepts for a lightweight wheelset will be defined. Main focus areas are material selection, durability, manufacturing process and joining methods. The output of this project will be important input for the parallel member project in IP1 both regarding the Cost Model and the technical innovations. There will also be a contribution to the overall S2R KPI’s and partly IP3.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data