NFCU (Gainesville, VA)
One of 10,000+ projects Taiyo tracks in Virginia.
Source: Dodge
The scope of work for this permit is limited to the following: 1. Selective interior renovation of the existing banking facility to align with current nfcu standards. Finishes are to match the existing branch standard in the front of house and woriwault room. Multipurpose room will receive the latest nfcu standards. Work includes selective non-structural demolition and build back of indicated spac
- Status
- Closed
- Sector
- Commercial
- Location
- Gainesville, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NFCU (Gainesville, VA)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this permit is limited to the following: 1. Selective interior renovation of the existing banking facility to align with current nfcu standards. Finishes are to match the existing branch standard in the front of house and woriwault room. Multipurpose room will receive the latest nfcu standards. Work includes selective non-structural demolition and build back of indicated spaces. 2. Mechanical scope is limited to the relocation of select air devices at areas of work only,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Gainesville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
