Ngardara Project Microgrid
Planned · Northern Territory · Last reported Apr 2026
Source: Department of the Prime Minister and Cabinet
A First Nations-owned utility-scale solar and battery microgrid project in Borroloola aimed at improving power reliability, lowering energy costs, and significantly reducing diesel use.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Power Transmission, Solar, Stadium, Commercial
- Location
- Borroloola, Northern Territory, Australia
- Updated
- 22 Jul 2026
- Source
- Department of the Prime Minister and Cabinet
ConstructChat
Ask ConstructChat about Ngardara Project Microgrid
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A First Nations-owned utility-scale solar and battery microgrid project in Borroloola aimed at improving power reliability, lowering energy costs, and significantly reducing diesel use. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | Northern Territory |
City | Borroloola |
Source
Source | Department of the Prime Minister and Cabinet |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Power Transmission, Solar, Stadium, Commercial |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
