NGTL West Path Delivery 2023 Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The proposed Project includes the construction and operation of approximately 39.1 km of 48-inch nominal pipe size natural gas pipeline in three sections between Priddis and Blairmore, Alberta. If the Project is approved and built, some temporary infrastructure, such as access roads, will be required during construction.
- Status
- Under Construction
- Sector
- Chemical (Industrial), Natural Gas, Road, Oil and Gas, Commercial, Manufacturing (Industrial)
- Location
- Longview, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NGTL West Path Delivery 2023 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Project includes the construction and operation of approximately 39.1 km of 48-inch nominal pipe size natural gas pipeline in three sections between Priddis and Blairmore, Alberta. If the Project is approved and built, some temporary infrastructure, such as access roads, will be required during construction. |
Budget |
Location
Country | Canada |
State | Alberta |
City | Longview |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Natural Gas, Road, Oil and Gas, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in Canada
- Voisey's Bay Civil Works
- Brandon - Diesel Exhaust Fluid - Bulk Tank Filling Station
- Henvey Inlet Wind Power Project Ontario
- Niagara Health System
- Port Hardy Water & Wastewater Treatment System
- Disinfection and Preliminary Treatment Upgrades
- Woodfibre LNG Project, British Columbia
- North West Upgrading Heavy Oil Upgrader
