NGTL West Path Delivery 2023 Project
Sector: Chemical (Industrial) • Location: Longview, Alberta, Canada
Source: Dodge USA
The proposed Project includes the construction and operation of approximately 39.1 km of 48-inch nominal pipe size natural gas pipeline in three sections between Priddis and Blairmore, Alberta. If the Project is approved and built, some temporary infrastructure, such as access roads, will be required during construction.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed Project includes the construction and operation of approximately 39.1 km of 48-inch nominal pipe size natural gas pipeline in three sections between Priddis and Blairmore, Alberta. If the Project is approved and built, some temporary infrastructure, such as access roads, will be required during construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
