logo
ProjectCompleted

Ngualla

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

Peak Resources Limited (“Peak”) is an Australian junior mining company focused on advancing its wholly owned Ngualla Rare Earth Project (“Ngualla” or the “Project”) in south western Tanzania. The Ngualla deposit was first discovered by Peak in 2010 and after several years of exploration drilling, Peak completed a Preliminary Feasibility Study (PFS) in March 2014 to assess the potential for future

Status
Closed
Sector
Oil and Gas, Commercial, Chemical (Industrial), Metal, Government, Manufacturing (Industrial)
Location
Tanzania
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Ngualla

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ngualla” is an infrastructure initiative in the Oil and Gas sector, located in Tanzania. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Peak Resources Limited (“Peak”) is an Australian junior mining company focused on advancing its wholly owned Ngualla Rare Earth Project (“Ngualla” or the “Project”) in south western Tanzania. The Ngualla deposit was first discovered by Peak in 2010 and after several years of exploration drilling, Peak completed a Preliminary Feasibility Study (PFS) in March 2014 to assess the potential for future mine development and associated beneficiation, recovery and separation plants and infrastructure. Results indicate that the Ngualla deposit provides sufficient ore for a potential 40+ year mine life. The operation, as contemplated in the PFS, is expected to produce ~10,000 metric tonnes per annum of separated high purity rare earth oxides. Peak is now proceeding to complete a Bankable Feasibility Study (BFS), the final milestone to confirm the commercial viability of the deposit. Construction is forecast to commence in mid-2016, with commissioning to follow 18 months later.Ngualla has a JORC compliant mineral resource of 195 million tonnes (MT) at 2.26 percent Rare Earth Oxide (REO) grade (4.4 MT of contained REO), including mineral reserves from a core 21.6 MT weathered Bastnaesite Zone at 4.54 percent REO for 982,000 tonnes of contained REO.

Original sector

B-BG - All Other Metal (Including Tin, Tantalum, Tungsten, etc.)

Budget

Location

Country

Tanzania

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Oil and Gas, Commercial, Chemical (Industrial), Metal, Government, Manufacturing (Industrial)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project