logo

Nguya Floating Liquefied Natural Gas (FLNG) Vessel

Under construction · Republic of Congo · Last reported Sep 2025

Source: World Oil

Project
Under Construction

The Nguya FLNG vessel is set to sail from China to the Republic of Congo in September 2025 as part of the second phase of the Congo LNG project. This addition aims to increase the project's production capacity by 2.4 million tons per annum, enhancing the country's position as an LNG exporter.

Status
Under Construction
Sector
Natural Gas, Oil and Gas, LNG
Location
Republic of the Congo
Updated
22 Jul 2026
Source
World Oil

ConstructChat

Ask ConstructChat about Nguya Floating Liquefied Natural Gas (FLNG) Vessel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Nguya Floating Liquefied Natural Gas (FLNG) Vessel” is an infrastructure initiative in the Natural Gas sector, located in Republic of Congo. Taiyo aggregates data on it from World Oil.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Nguya FLNG vessel is set to sail from China to the Republic of Congo in September 2025 as part of the second phase of the Congo LNG project. This addition aims to increase the project's production capacity by 2.4 million tons per annum, enhancing the country's position as an LNG exporter.

Original sector

Energy

Location

Country

Republic of the Congo

Source

Source

World Oil

URL

More Details

Record type

Project

Sector

Natural Gas, Oil and Gas, LNG

Article published date

2025-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project