logo
ProjectClosed

NH/DOT: EV Load Posting Signs Install

Sector: Bridge • Location: Laconia, New Hampshire, United States of America

Source: Dodge USA

This Project Installs Emergency Vehicle (Ev) Load Posting Signs At 368 Bridges (Collectively Called Group 2) Statewide As Mandated By The Fixing America S Surface Transportation (Fast) Act.

Status
Closed
Sector
Bridge, Electric Vehicles (EVs), Automotive, Rail, Commercial, Road, Mass Transit, Power Generation (CCGT)
Location
Laconia, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NH/DOT: EV Load Posting Signs Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NH/DOT: EV Load Posting Signs Install” is an infrastructure initiative in the Bridge sector, located in Laconia, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Project Installs Emergency Vehicle (Ev) Load Posting Signs At 368 Bridges (Collectively Called Group 2) Statewide As Mandated By The Fixing America S Surface Transportation (Fast) Act.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Laconia

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Electric Vehicles (EVs), Automotive, Rail, Commercial, Road, Mass Transit, Power Generation (CCGT)

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project