logo

NH/DOT: Slope Stabilization Repair

Sector: Commercial • Location: Bristol, New Hampshire, United States of America

Source: Dodge

Project
Closed

This Project Includes Slope Stabilization Work On Parcel #1 At 10 Summer Street In Alstead Adjacent To Nh 12a And Demolition Of The Existing Residential Structure At 10 Summer Street.

Status
Closed
Sector
Commercial, Manufacturing (Industrial), Residential, Road
Location
Bristol, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NH/DOT: Slope Stabilization Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NH/DOT: Slope Stabilization Repair” is an infrastructure initiative in the Commercial sector, located in Bristol, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Project Includes Slope Stabilization Work On Parcel #1 At 10 Summer Street In Alstead Adjacent To Nh 12a And Demolition Of The Existing Residential Structure At 10 Summer Street.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Bristol

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Residential, Road

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project