NHPA Parking Access & Revenue Control System Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work for this project includes, but is not limited to: removal of existing equipment and installation of a new state-of-the-art Parking Access and Revenue Control System, refurbishment of designated booths inclusive of painting, metal repair, roofing and related finishes, installation of new HVAC and lighting with associated ductwork repairs and replacement, design and install integratable sec
- Status
- Prospective
- Sector
- Metal, Commercial, Car parking, Automotive, Manufacturing (Industrial), Government
- Location
- New Haven, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NHPA Parking Access & Revenue Control System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for this project includes, but is not limited to: removal of existing equipment and installation of a new state-of-the-art Parking Access and Revenue Control System, refurbishment of designated booths inclusive of painting, metal repair, roofing and related finishes, installation of new HVAC and lighting with associated ductwork repairs and replacement, design and install integratable security cameras and door control system for all Garage pedestrian entrances, miscellaneous coordina... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New Haven |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Car parking, Automotive, Manufacturing (Industrial), Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
