Niagara Bottling Building
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Dodge
Niagara MES Line 3 - Addition, T.I., & Reclassification Remodel existing type II-B warehouse and production including limited interior demolition, new floor drains, below-slab floor plumbing, thickened/reinforced concrete slabs, electrical, and HVAC building to support new production equipment. Install 1,468 SF utility room addition. Occupancy square footages changed from previous CoO. New design
- Status
- Under Construction
- Sector
- Steel, Cement, Commercial, Manufacturing (Industrial), Warehouse, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Niagara Bottling Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Niagara MES Line 3 - Addition, T.I., & Reclassification Remodel existing type II-B warehouse and production including limited interior demolition, new floor drains, below-slab floor plumbing, thickened/reinforced concrete slabs, electrical, and HVAC building to support new production equipment. Install 1,468 SF utility room addition. Occupancy square footages changed from previous CoO. New design consists of Groups B: 5,709 SF, F-1: 124,944 SF, S-1: 323,230 SF & F:1 391 SF (separate fire rise... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Commercial, Manufacturing (Industrial), Warehouse, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
