logo
ProjectUnknown

Niagara Falls Entertainment Centre

The status, timeline and source of this project. A free account opens every field.

Source: Bird Construction

Bird, as part of the Niagara Falls Entertainment Partners consortium, has executed a contract to design, build, finance and maintain the Niagara Falls Entertainment Centre (NFEC) facility for the Ontario Lottery and Gaming Corporation in the City of Niagara Falls. Bird took a minority equity interest in the concession responsible for the design, construction, financing, and maintenance of the proj

Status
Unknown
Sector
Car parking, Commercial, Hotel, Residential, Road, Automotive, Manufacturing (Industrial), Government
Location
Canada
Updated
22 Jul 2026
Source
Bird Construction

ConstructChat

Ask ConstructChat about Niagara Falls Entertainment Centre

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Niagara Falls Entertainment Centre” is an infrastructure initiative in the Car parking sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Participants

Sponsoring Agency

Company

Status

Original status

unknown

Taiyo status

Unknown

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bird, as part of the Niagara Falls Entertainment Partners consortium, has executed a contract to design, build, finance and maintain the Niagara Falls Entertainment Centre (NFEC) facility for the Ontario Lottery and Gaming Corporation in the City of Niagara Falls. Bird took a minority equity interest in the concession responsible for the design, construction, financing, and maintenance of the project through Bird Capital, a wholly owned subsidiary. The facility features a performance space with multiple stage configurations and provides seating for 5,000 patrons. It also features a public lobby and gathering places, box offices, bar, and concessions. Located immediately west of the Niagara Falls Hilton Hotel, the building was constructed above an existing parking structure with limited lot lines. The south end is cantilevered over the top of the Hilton’s main driveway and built off sloped columns. On the north side, the structure is hung off existing corbels that were intended for a future expansion of the Hilton. In addition to the sheer size of the structure, intricate planning was required to seamlessly tie into the Hilton Hotel’s three towers. The fire rating of the two facilities also had to be maintained to ensure that the needs of both the building code and project specifications were met. Another challenge overcome by the Bird team was the movement of materials within the site during construction, especially during the height of the tourist season. To mitigate this, material handling was primarily performed by cranes and hoists within the NFEC building footprint. This exciting project was designed and constructed to LEED® v4 standards and was completed in June 2020.

Procurement method

Location

Country

Canada

Source

Source reliability

High

Source

Bird Construction

URL

More Details

Record type

Project

Sector

Car parking, Commercial, Hotel, Residential, Road, Automotive, Manufacturing (Industrial), Government

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project