logo

Niagara Falls Entertainment Centre

Sector: Car parking • Location: Canada

Source: Bird Construction

Project
Unknown

Bird, as part of the Niagara Falls Entertainment Partners consortium, has executed a contract to design, build, finance and maintain the Niagara Falls Entertainment Centre (NFEC) facility for the Ontario Lottery and Gaming Corporation in the City of Niagara Falls. Bird took a minority equity interest in the concession responsible for the design, construction, financing, and maintenance of the proj

Project Information FAQ

Project Information

4 Q
The project “Niagara Falls Entertainment Centre” is an infrastructure initiative in the Car parking sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bird, as part of the Niagara Falls Entertainment Partners consortium, has executed a contract to design, build, finance and maintain the Niagara Falls Entertainment Centre (NFEC) facility for the Ontario Lottery and Gaming Corporation in the City of Niagara Falls. Bird took a minority equity interest in the concession responsible for the design, construction, financing, and maintenance of the project through Bird Capital, a wholly owned subsidiary. The facility features a performance space with multiple stage configurations and provides seating for 5,000 patrons. It also features a public lobby and gathering places, box offices, bar, and concessions. Located immediately west of the Niagara Falls Hilton Hotel, the building was constructed above an existing parking structure with limited lot lines. The south end is cantilevered over the top of the Hilton’s main driveway and built off sloped columns. On the north side, the structure is hung off existing corbels that were intended for a future expansion of the Hilton. In addition to the sheer size of the structure, intricate planning was required to seamlessly tie into the Hilton Hotel’s three towers. The fire rating of the two facilities also had to be maintained to ensure that the needs of both the building code and project specifications were met. Another challenge overcome by the Bird team was the movement of materials within the site during construction, especially during the height of the tourist season. To mitigate this, material handling was primarily performed by cranes and hoists within the NFEC building footprint. This exciting project was designed and constructed to LEED® v4 standards and was completed in June 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data