Niagara Falls Waste Water Treatment Plant Flocculation, Grit and Primary Tank Gate Upgrade

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The project includes: • Installation of the pre-purchased gates valves for the flocculation and grit tanks • Purchase and installation of eighteen (18) new gate valves for the primary tanks. The project is incremental in nature in that the project had been removed from our 2017 capital budget due to insufficient regional funding required to proceed with the construction phase. The Clean Water and

Project Information FAQ

Project Information

5 Q
The project “Niagara Falls Waste Water Treatment Plant Flocculation, Grit and Primary Tank Gate Upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes: • Installation of the pre-purchased gates valves for the flocculation and grit tanks • Purchase and installation of eighteen (18) new gate valves for the primary tanks. The project is incremental in nature in that the project had been removed from our 2017 capital budget due to insufficient regional funding required to proceed with the construction phase. The Clean Water and Wastewater Fund will allow us to proceed with a key infrastructure project. The Niagara Falls Waste Water Treatment Plant (WWTP) treats sewage from approximately 127,410 people, and supports the demand of over 30 million tourists. This Class 4 WWTP was built in 1964 and the Flocculation, Grit and Primary Tank system are original to the plant. Niagara Falls WWTP has operational limitations in the secondary treatment process. The Ministry of Environment and Climate Change is aware of this challenge and is strongly encouraging the Region to correct this operational issue. This is a result of significant sulphide loading from the primary tanks to the rotating biological contactors. High levels of hydrogen sulphide are a result of the inability to adequately control retention times in the grit, flocculation and primary tanks. All existing slide gate valves in these tanks have reached the end of their service life (valves in primary tanks 1, 2 and 3 are original 1964). With new valves installed staff will be able to optimize the retention time and effluent flows from the grit, flocculation and primary tanks which will aid in meeting the effluent regulations for toxicity/ nitrification. Replacement costs are based on information from two slide gate valve supply firms which are listed on the Regions Approved Product Equipment List (APEL). Typical mechanical equipment installation costs are 150% of equipment purchase costs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data