NICARAGUA POWER TRANSMISSION
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of the reinforcement of the existing national load dispatch centre, construction of 700 km of new 138 kV and 230 kV transmission lines, construction of 15 new 138 kV substations with a total capacity of 1050 MVA, and expansion of 7 existing substations.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Raw Materials, Fertilizers
- Location
- Nicaragua
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NICARAGUA POWER TRANSMISSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of the reinforcement of the existing national load dispatch centre, construction of 700 km of new 138 kV and 230 kV transmission lines, construction of 15 new 138 kV substations with a total capacity of 1050 MVA, and expansion of 7 existing substations. |
Original sector | Energy |
Budget |
Location
Country | Nicaragua |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Raw Materials, Fertilizers |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
