Niger - Samira hill-Libiri Gold Mining Project
Sector: Water Supply and Storage • Location: Niger
Source: African Development Bank (AfDB)
The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibili
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibility of producing a minimum of 22 tonnes of gold metal under the Project over a 7-year period. The project comprises the construction of an opencast mine, construction of a coal leaching process capable of processing up to 6,000 tonnes of ore daily at a production cost of US$ 185/oz and the putting in place of related facilities. The main components of the project are: access roads and landing strip; opencast mining operations; installation of the coal leaching plant; surface water dam and storage reservoir; pumping station and pipeline supplying the dam; electricity production and distribution equipment; and development of living areas and management of the environment as well as the construction of a residual dyke and the provision of a net working capital. The pumping station, pipeline and dam are already operational. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
