logo
Project

Niger - Samira hill-Libiri Gold Mining Project

Sector: Road • Location: Niger

Source: African Development Bank (AfDB)

The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibili

Sector
Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Government
Location
Niger
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Niger - Samira hill-Libiri Gold Mining Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Niger - Samira hill-Libiri Gold Mining Project” is an infrastructure initiative in the Road sector, located in Niger. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibility of producing a minimum of 22 tonnes of gold metal under the Project over a 7-year period. The project comprises the construction of an opencast mine, construction of a coal leaching process capable of processing up to 6,000 tonnes of ore daily at a production cost of US$ 185/oz and the putting in place of related facilities. The main components of the project are: access roads and landing strip; opencast mining operations; installation of the coal leaching plant; surface water dam and storage reservoir; pumping station and pipeline supplying the dam; electricity production and distribution equipment; and development of living areas and management of the environment as well as the construction of a residual dyke and the provision of a net working capital. The pumping station, pipeline and dam are already operational.

Original sector

Industry, Mining, Construction

Budget

Location

Country

Niger

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project