Niger - Samira hill-Libiri Gold Mining Project
Sector: Road • Location: Niger
Source: African Development Bank (AfDB)
The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibili
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Government
- Location
- Niger
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Niger - Samira hill-Libiri Gold Mining Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibility of producing a minimum of 22 tonnes of gold metal under the Project over a 7-year period. The project comprises the construction of an opencast mine, construction of a coal leaching process capable of processing up to 6,000 tonnes of ore daily at a production cost of US$ 185/oz and the putting in place of related facilities. The main components of the project are: access roads and landing strip; opencast mining operations; installation of the coal leaching plant; surface water dam and storage reservoir; pumping station and pipeline supplying the dam; electricity production and distribution equipment; and development of living areas and management of the environment as well as the construction of a residual dyke and the provision of a net working capital. The pumping station, pipeline and dam are already operational. |
Original sector | Industry, Mining, Construction |
Budget |
Location
Country | Niger |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Niger
- Niger - Vocational and Technical Education Development Support Project (PADEFPT) - supplementary loan
- Niger - Kandadji Ecosystems Regeneration and Niger Valley Development Programme Support Project (PA KRESMIN)
- Cotecna Inspection S.A., Niamey Liaison Office
- Strengthening capacity for dialogue and conflict transformation in the context of cross-border transhumance in Niger, Burkina Faso and Benin
- Management of migration challenges in Niger
- Migration policy advice in Niger
- Bamako-Niamey Road Missing Links in Niger
- Burkina Faso Border-Niamey-Zinder-Chad Border Missing Road Links
