logo

Niger - Samira hill-Libiri Gold Mining Project

Sector: Water Supply and Storage • Location: Niger

Source: African Development Bank (AfDB)

Project

The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibili

Project Information FAQ

Project Information

4 Q
The project “Niger - Samira hill-Libiri Gold Mining Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Niger. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention is relative to the Samira Hill-Libiri Gold Mining Project. This project entails the production of gold in Niger for export on two adjacent deposits respectively called Samira Hill and Libiri, both of which are to be mined under the Project. These deposits are 3 kilometers apart. To date, the assessment of proven reserves have shown the existence and therefore the possibility of producing a minimum of 22 tonnes of gold metal under the Project over a 7-year period. The project comprises the construction of an opencast mine, construction of a coal leaching process capable of processing up to 6,000 tonnes of ore daily at a production cost of US$ 185/oz and the putting in place of related facilities. The main components of the project are: access roads and landing strip; opencast mining operations; installation of the coal leaching plant; surface water dam and storage reservoir; pumping station and pipeline supplying the dam; electricity production and distribution equipment; and development of living areas and management of the environment as well as the construction of a residual dyke and the provision of a net working capital. The pumping station, pipeline and dam are already operational.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data