logo
Project

Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) – Phase I (ROADS)

Sector: Waste Processing and Treatment • Location: Nigeria

Source: African Development Bank (AfDB)

The Abia State Integrated Infrastructure Development Project entails the rehabilitation of roads and erosion control infrastructure as well as the finalization of preparatory studies for solid waste disposal management in the cities of Aba and Umuahia in Abia State. These are an AfDB loan of up to USD 100 million and a Canada-African Development Bank Climate Fund (CACF) loan of up to USD 15 millio

Sector
Waste Processing and Treatment, Water Supply and Storage, Automotive, Biomass, Hospital, Cement, Road, Commercial, Government
Location
Nigeria
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) – Phase I (ROADS)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) – Phase I (ROADS)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Abia State Integrated Infrastructure Development Project entails the rehabilitation of roads and erosion control infrastructure as well as the finalization of preparatory studies for solid waste disposal management in the cities of Aba and Umuahia in Abia State. These are an AfDB loan of up to USD 100 million and a Canada-African Development Bank Climate Fund (CACF) loan of up to USD 15 million to the Federal Republic of Nigeria. The Project will rehabilitate 58.03 km of roads in Umuahia and 190.43km of roads in Aba to asphaltic concrete (AC) standards of varying cross sections. One erosion control site, each in Aba and Umuahia cities will be reinstated in addition. A comprehensive preparatory study exploring the potential for private sector participation through public private partnerships (PPPs) will be carried out for the implementation of the waste disposal component of the project in the next phase. This project primely contributes towards climate adaptation result. As such 67.5% of the total approval is attributed as climate finance, out of which 50 million USD is adaptation finance.

Original sector

General Budget Support

Budget

Location

Country

Nigeria

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Automotive, Biomass, Hospital, Cement, Road, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project