logo
Project

Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

This intervention focuses on Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies. This is a priority project for the state of Abia and the Federal Government of Nigeria. These studies will facilitate the assessment of the feasibility, detailed engineering design, and preparation of tender documents for the execution of the roads, solid waste management, and the g

Sector
Waste Processing and Treatment, Water Supply and Storage, Biomass, Mass Transit, Road, Government
Location
Nigeria
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This intervention focuses on Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies. This is a priority project for the state of Abia and the Federal Government of Nigeria. These studies will facilitate the assessment of the feasibility, detailed engineering design, and preparation of tender documents for the execution of the roads, solid waste management, and the gully erosion works components of the Abia State Integrated Infrastructure Development Project. The expected outputs of the study will include; (i) feasibility study reports, (ii) detailed engineering design reports that cover design, soils/materials investigation, hydrologic/hydraulic design, environmental and social impact assessment (ESMP), drawings, specifications, and bidding documents for the execution of the various roads, and solid waste management components of the project.

Original sector

Transport & Storage

Budget

Location

Country

Nigeria

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Biomass, Mass Transit, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project