logo

Nigeria - Ibadan Water Supply II Project

Sector: Water Supply and Storage • Location: Nigeria

Source: African Development Bank (AfDB)

Project

The proposed project as a follow up to an earlier project Ibadan Emergency Water Rehabilitation Project approved by the Bank in 1986. The emergency project sought to rehabilitate the existing water supply infrastructure which was in a state of total disrepair to restore it to its original installed capacity of 122 500 m3/d. This second Ibadan Water Supply Project involves the duplication of the ma

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Ibadan Water Supply II Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project as a follow up to an earlier project Ibadan Emergency Water Rehabilitation Project approved by the Bank in 1986. The emergency project sought to rehabilitate the existing water supply infrastructure which was in a state of total disrepair to restore it to its original installed capacity of 122 500 m3/d. This second Ibadan Water Supply Project involves the duplication of the main treatment plant for the City which would increase the supply by a further 82,000 m3/d. It is recognized that these duplication works should have been put in place some ten years or so ago. Howerer. The reinforcement and extention of the existing network which will be supplied by a twin trunk rising pipeline to be constructed under the proposed project, would significantly improve the supply to Ibadan, even more so, when the effects of the on-going leak detection and repairs are also taken into account. At the same time the project will extend the coverage by some 20 sq km, reinforcig the existing network and strengthening the institution so that it can operate commercially. The components include the following: i) Supply and Laying of Pipes; ii) Construction of General Civil Engineering works; iii) Provision of Operational Equipement; iv) Provision of Technical Assistance; v) Provision of Engineering Services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data