logo

Nigeria - Indorama Fertilizer Plant

Sector: Manufacturing (Industrial) • Location: Nigeria

Source: African Development Bank (AfDB)

Project

This project consists of the construction and operation of a 1.4 MTPA gas to urea fertilizer plant to be located in Port Harcourt, River State, Nigeria. The plant will be located in the Eleme’s existing industrial complex and will use 38 ha of land out of the 235 ha of surplus land currently available. Urea will be sold in export (80% to 50%) and domestic market (20% to 50%). Targeted markets are

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Indorama Fertilizer Plant” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the construction and operation of a 1.4 MTPA gas to urea fertilizer plant to be located in Port Harcourt, River State, Nigeria. The plant will be located in the Eleme’s existing industrial complex and will use 38 ha of land out of the 235 ha of surplus land currently available. Urea will be sold in export (80% to 50%) and domestic market (20% to 50%). Targeted markets are Nigeria, South Africa, Ghana, Benin, USA, Brazil, UK and India. Other project components will include: (i) a 84km pipeline; and (ii) a multipurpose jetty and terminal infrastructure at Onne Port (16km from project site). The project will address one of the significant constraints to agriculture growth and development in Nigeria (and the entire African Continent) which remains the lack of adequate fertilizer utilization. It will have a direct effect on the rate of economic development and is fundamental to sustainable economic growth for the FGN. Its total cost is estimated at USD 1.2 billion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data