Nigeria - Indorama Fertilizer Plant
Sector: Oil and Gas • Location: Nigeria
Source: African Development Bank (AfDB)
This project consists of the construction and operation of a 1.4 MTPA gas to urea fertilizer plant to be located in Port Harcourt, River State, Nigeria. The plant will be located in the Eleme’s existing industrial complex and will use 38 ha of land out of the 235 ha of surplus land currently available. Urea will be sold in export (80% to 50%) and domestic market (20% to 50%). Targeted markets are
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of the construction and operation of a 1.4 MTPA gas to urea fertilizer plant to be located in Port Harcourt, River State, Nigeria. The plant will be located in the Eleme’s existing industrial complex and will use 38 ha of land out of the 235 ha of surplus land currently available. Urea will be sold in export (80% to 50%) and domestic market (20% to 50%). Targeted markets are Nigeria, South Africa, Ghana, Benin, USA, Brazil, UK and India. Other project components will include: (i) a 84km pipeline; and (ii) a multipurpose jetty and terminal infrastructure at Onne Port (16km from project site). The project will address one of the significant constraints to agriculture growth and development in Nigeria (and the entire African Continent) which remains the lack of adequate fertilizer utilization. It will have a direct effect on the rate of economic development and is fundamental to sustainable economic growth for the FGN. Its total cost is estimated at USD 1.2 billion. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
