logo
Project

Nigeria - Kwara State Health Project

Sector: Hospital • Location: Nigeria

Source: African Development Bank (AfDB)

The project will support Kwara State Ministry of Health (KWSMoH) effort to complete 8 secondary hospitals in order to provide adequate referral services and specific coverage to population served by PHC in each of the selected LGAs. Each hospital will be built to be fully functional in terms of service areas, equipment, diagnostic services and staffing. The project aims at improving health status

Sector
Hospital, Government
Location
Nigeria
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Nigeria - Kwara State Health Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Kwara State Health Project” is an infrastructure initiative in the Hospital sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will support Kwara State Ministry of Health (KWSMoH) effort to complete 8 secondary hospitals in order to provide adequate referral services and specific coverage to population served by PHC in each of the selected LGAs. Each hospital will be built to be fully functional in terms of service areas, equipment, diagnostic services and staffing. The project aims at improving health status of the communities in the Kwara, Kogi and Niger States through a primary health care strategy. The KWSMoH plan calls for strengthening of the PHC system to provide improved quality services at the services at the primary level. To the end, the secondary hospital would be the pivotal point for ensuring that a linkage with the PHC facilities in the catchment area is maintained in terms of an organized referral system, technical and management systems support and the provision of quality clinical supervision and in service training for PHC service providers. The project is comprised of the followings components: I) Completion of eight (8) District General Hospitals; II) Construction of housing for fifty-two (52) Staff Housing at eight Hospitals; III) Establishment of maintenance unit; and IV) Project Implementation Unit. It will be executed in 36 months.

Original sector

Health

Budget

Location

Country

Nigeria

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Hospital, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project