Nigeria - Kwara State Health Project
Sector: Hospital • Location: Nigeria
Source: African Development Bank (AfDB)
The project will support Kwara State Ministry of Health (KWSMoH) effort to complete 8 secondary hospitals in order to provide adequate referral services and specific coverage to population served by PHC in each of the selected LGAs. Each hospital will be built to be fully functional in terms of service areas, equipment, diagnostic services and staffing. The project aims at improving health status
- Sector
- Hospital, Government
- Location
- Nigeria
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Nigeria - Kwara State Health Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will support Kwara State Ministry of Health (KWSMoH) effort to complete 8 secondary hospitals in order to provide adequate referral services and specific coverage to population served by PHC in each of the selected LGAs. Each hospital will be built to be fully functional in terms of service areas, equipment, diagnostic services and staffing. The project aims at improving health status of the communities in the Kwara, Kogi and Niger States through a primary health care strategy. The KWSMoH plan calls for strengthening of the PHC system to provide improved quality services at the services at the primary level. To the end, the secondary hospital would be the pivotal point for ensuring that a linkage with the PHC facilities in the catchment area is maintained in terms of an organized referral system, technical and management systems support and the provision of quality clinical supervision and in service training for PHC service providers. The project is comprised of the followings components: I) Completion of eight (8) District General Hospitals; II) Construction of housing for fifty-two (52) Staff Housing at eight Hospitals; III) Establishment of maintenance unit; and IV) Project Implementation Unit. It will be executed in 36 months. |
Original sector | Health |
Budget |
Location
Country | Nigeria |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Hospital, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hospital projects in Nigeria
- Qua Iboe Power Project
- Nigerian Telecommunications Ltd (Nitel) Divestiture
- Nigeria - FSDH Merchant Bank Limited (FSDH) - Trade Finance Line of Credit (TFLOC) and Transaction Guarantee (TG)
- Kasada Hospitality Fund LP, Sub-project Galaxy
- Konexa Embedded Distribution Project
- Bauchi State Health Project
- Nigeria - Ebonyi State Ring Road Project
- Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) – Phase I (ROADS)
