Nigeria - Nigeria Transmission Expansion Project Phase 1
Sector: Government • Location: Nigeria
Source: African Development Bank (AfDB)
The Nigeria Transmission Expansion Project – phase 1 (NTEP 1) is part of the national Transmission Rehabilitation and Expansion Programme (TREP). This programme aims to support the rehabilitation and upgrade of Nigeria’s electricity transmission substations and lines, to increase power transmission network and allow distribution companies to improve supply to consumers. NTEP 1 is composed of brown
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Nigeria Transmission Expansion Project – phase 1 (NTEP 1) is part of the national Transmission Rehabilitation and Expansion Programme (TREP). This programme aims to support the rehabilitation and upgrade of Nigeria’s electricity transmission substations and lines, to increase power transmission network and allow distribution companies to improve supply to consumers. NTEP 1 is composed of brownfield and greenfield projects, and aims at strengthening and improving the grid wheeling capacity where the transmission lines are the most constrained. It involves (i) the reconstruction of two (2) 330kV double circuit quad transmission lines, 138km Alaoji–Onitsha and 125km Delta–Benin; (ii) the construction of one (1) 330kV double circuit quad transmission line, 204km Kaduna–Kano; (iii) the construction of two (2) 330/132kV, 2 x 150MVA Sub stations at Zaria and Millennium City; (iv) The construction of two (2) 132/33kV, 2x 60MVA Sub stations at Rigasa and Jaji respectively. The three (03) components included in NTEP 1 are: (1) strengthening and improvement of the electricity transmission system, (2) impact mitigation and compensation, and (3) capacity building and technical assistance. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
