logo

Nigeria - Nigeria Transmission Expansion Project Phase 1

Sector: Government • Location: Nigeria

Source: African Development Bank (AfDB)

Project

The Nigeria Transmission Expansion Project – phase 1 (NTEP 1) is part of the national Transmission Rehabilitation and Expansion Programme (TREP). This programme aims to support the rehabilitation and upgrade of Nigeria’s electricity transmission substations and lines, to increase power transmission network and allow distribution companies to improve supply to consumers. NTEP 1 is composed of brown

Project Information FAQ

Project Information

4 Q
The project “Nigeria - Nigeria Transmission Expansion Project Phase 1” is an infrastructure initiative in the Government sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nigeria Transmission Expansion Project – phase 1 (NTEP 1) is part of the national Transmission Rehabilitation and Expansion Programme (TREP). This programme aims to support the rehabilitation and upgrade of Nigeria’s electricity transmission substations and lines, to increase power transmission network and allow distribution companies to improve supply to consumers. NTEP 1 is composed of brownfield and greenfield projects, and aims at strengthening and improving the grid wheeling capacity where the transmission lines are the most constrained. It involves (i) the reconstruction of two (2) 330kV double circuit quad transmission lines, 138km Alaoji–Onitsha and 125km Delta–Benin; (ii) the construction of one (1) 330kV double circuit quad transmission line, 204km Kaduna–Kano; (iii) the construction of two (2) 330/132kV, 2 x 150MVA Sub stations at Zaria and Millennium City; (iv) The construction of two (2) 132/33kV, 2x 60MVA Sub stations at Rigasa and Jaji respectively. The three (03) components included in NTEP 1 are: (1) strengthening and improvement of the electricity transmission system, (2) impact mitigation and compensation, and (3) capacity building and technical assistance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data