logo

Nigeria - The Lekki Toll Road Project

Sector: Automotive • Location: Nigeria

Source: African Development Bank (AfDB)

Project

The Lekki Toll Road Project involves the development and widening of the existing 49.5km Lekki-Epe expressway and the installations of toll plazas. The Lekki-Epe expressway is the main link between Victoria Island in Lagos and Lekki peninsula. The project's total cost is estimated at about 44.91 billion Nigerian Naira (NGN). Its implementation will be conducted in two phases. In the first phase, L

Project Information FAQ

Project Information

4 Q
The project “Nigeria - The Lekki Toll Road Project” is an infrastructure initiative in the Automotive sector, located in Nigeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lekki Toll Road Project involves the development and widening of the existing 49.5km Lekki-Epe expressway and the installations of toll plazas. The Lekki-Epe expressway is the main link between Victoria Island in Lagos and Lekki peninsula. The project's total cost is estimated at about 44.91 billion Nigerian Naira (NGN). Its implementation will be conducted in two phases. In the first phase, Lekki Concession Company Ltd (LCC), which is responsible for the execution of the project, will carry out the civil engineering works for the construction of a new access ramp to direct traffic to Falomo bridge, new interchanges, footbridges, pedestrian crossings, bus stops along the expressway, and the construction of a 6 km section of the 20 km long new coastal road. It will also build ten linkages between the expressway and the coastal road, in addition to constructing three toll stations. The second phase of the project implementation will focus on the construction of the remaining 14 km stretch of the coastal road. The completion of the toll road construction should reduce road delays while improving road safety and safety, and reduce the cost of operating vehicles for road users, create jobs and provide a well maintained transport infrastructure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data