Nigeria Nuclear Power Plants Project
Sector: Power Generation (CCGT) • Location: Lagos, Nigeria
Source: Realnews Magazine
The Nigeria Atomic Energy Commission signed a Memorandum of Understanding in 2016 with ROSATOM for the construction of four nuclear power plants in Nigeria. The proposed facilities are estimated to cost about 80 billion dollars with a projected combined generation capacity of 4,800 megawatts by 2035. The current status of the plans is unknown, and discussions have been largely secretive and exclud
- Sector
- Power Generation (CCGT), Nuclear
- Location
- Lagos, Nigeria
- Updated
- 22 Jul 2026
- Source
- Realnews Magazine
ConstructChat
Ask ConstructChat about Nigeria Nuclear Power Plants Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Nigeria Atomic Energy Commission signed a Memorandum of Understanding in 2016 with ROSATOM for the construction of four nuclear power plants in Nigeria. The proposed facilities are estimated to cost about 80 billion dollars with a projected combined generation capacity of 4,800 megawatts by 2035. The current status of the plans is unknown, and discussions have been largely secretive and excluded civil society groups. |
Original sector | Energy |
Budget |
Location
Country | Nigeria |
City | Lagos |
Source
Source | Realnews Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Nuclear |
Article published date | 2026-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
