NILE DELTA DRAINAGE I
Sector: Water Supply and Storage • Location: Egypt, Arab Republic of
Source: World Bank Group
The project proposed for financing by the Association would be the first phase of a multi-stage program to provide improved drainage throughout four million feddans in the Nile Delta and eventually throughout the entire Nile Valley in Egypt. The project would provide tile drainage for about 950,000 feddans. The proposed credit would cover the total foreign exchange costs of US$26 million. The prin
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NILE DELTA DRAINAGE I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposed for financing by the Association would be the first phase of a multi-stage program to provide improved drainage throughout four million feddans in the Nile Delta and eventually throughout the entire Nile Valley in Egypt. The project would provide tile drainage for about 950,000 feddans. The proposed credit would cover the total foreign exchange costs of US$26 million. The principal elements of the project would be: the installation of tile drains by mechanized means; the remodeling of open drains and structures to discharge the greater drainage flows; the construction of eleven pump stations; the construction of workshops and procurement of transport for supporting services; and the employment of consultants to advise and assist the project authority. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
