Ningyang City Solid Waste Incineration Power Plant Phase I
Sector: Biomass • Location: China
Source: World Bank Group
In April 2014, a local private company Anhui Shengyun Machinery Company Limited signed a BOT contract to finance, build and operate a solid waste incineration power plant in Ningyang City, Shandong Province. The total investment was US$ 43.62 million (RMB 271.6566 million) and Anhui Shengyun had a 100% stake in the project. Once completed the facility can process 500 tons of solid waste per day. T
- Status
- Prospective
- Sector
- Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Warehouse, Manufacturing (Industrial)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ningyang City Solid Waste Incineration Power Plant Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2014, a local private company Anhui Shengyun Machinery Company Limited signed a BOT contract to finance, build and operate a solid waste incineration power plant in Ningyang City, Shandong Province. The total investment was US$ 43.62 million (RMB 271.6566 million) and Anhui Shengyun had a 100% stake in the project. Once completed the facility can process 500 tons of solid waste per day. The plant had a power generation capacity of 9MW. The concession term was 30 years on top of 2 years of construction period. Construction commenced in May 2015. How Anhui Shengyun won the project was not reported. An SPV Ningyang Shengyun Environmental Protection Power Co., Ltd. was registered locally to implement the project. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Warehouse, Manufacturing (Industrial) |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
