Ninh Thuan 2 Nuclear Power Plant
Sector: Nuclear • Location: Ninh Thuan, Vietnam
Source: Reuters
Ninh Thuan 2 is a planned nuclear power plant in Vietnam with a capacity of 2 to 3.2 gigawatts. It is part of Vietnam's strategy to boost power generation capacity and is scheduled to come online by 2035 alongside Ninh Thuan 1, which has the same capacity. The project was originally awarded to Japan, but Japan has pulled out due to the tight timeline for completion. Vietnam is exploring other opti
- Status
- Failure
- Sector
- Nuclear, Power Generation (CCGT), Government
- Location
- Ninh Thuan, Vietnam
- Updated
- 22 Jul 2026
- Source
- Reuters
ConstructChat
Ask ConstructChat about Ninh Thuan 2 Nuclear Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled by japan |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ninh Thuan 2 is a planned nuclear power plant in Vietnam with a capacity of 2 to 3.2 gigawatts. It is part of Vietnam's strategy to boost power generation capacity and is scheduled to come online by 2035 alongside Ninh Thuan 1, which has the same capacity. The project was originally awarded to Japan, but Japan has pulled out due to the tight timeline for completion. Vietnam is exploring other options and investors from France, South Korea, and the U.S. have shown interest. |
Original sector | Energy |
Location
Country | Vietnam |
City | Ninh Thuan |
Source
Source | Reuters |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Government |
Article published date | 2025-12-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
