Ninth Street North Storm Sewer Partial Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
A partial replacement of a 1980’s 1400 mm diameter trunk CMP storm sewer that has deteriorated and raised out of grade by an estimated 600 mm creating poor flow and sedimentation problems up stream in the pipe. This storm sewer is a trunk main that services approximately 65 hectares with several hundred residential homes, several apartment complexes and two institutional properties. The drainage b
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Ninth Street North Storm Sewer Partial Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A partial replacement of a 1980’s 1400 mm diameter trunk CMP storm sewer that has deteriorated and raised out of grade by an estimated 600 mm creating poor flow and sedimentation problems up stream in the pipe. This storm sewer is a trunk main that services approximately 65 hectares with several hundred residential homes, several apartment complexes and two institutional properties. The drainage basin of the upstream 65 hectares has primarily steep topography making this pipe critical in handling storm runoff flows as the location at the pipe replacement location is relatively flat causing potential localized flooding at the raised and out of grade section. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
