logo

Nippulagavu Upgradation Project

Sector: Water Supply and Storage • Location: nandyal, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Water Resources Department, Govt. of A.P has come up with Nippulagavu Upgradation Project with a ticket size of 1415 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Kundu River is almost flattened and when the floods incurred the wat

Project Information FAQ

Project Information

5 Q
The project “Nippulagavu Upgradation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in nandyal, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Water Resources Department, Govt. of A.P has come up with Nippulagavu Upgradation Project with a ticket size of 1415 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The Kundu River is almost flattened and when the floods incurred the water area is spreading and inundating all villages surrounding the river and the entire Nandyal town. Almost all the bridges across Kundu are dilapidated condition and moreover they are very narrow and are submerging/overflows very frequently during the flood seasons. In order to overcome this situation the river courses are proposed for enhanced discharges of 35000 cusecs by re-sectioning with deeper bed levels to deplete the flood waters in the surrounding areas of inundation in faster way and protecting the banks by constructing side walls wherever necessary along the river course to avoid encroaching the flood waters into the villages. This work is proposed for Improvements to Escape Channel, Nippulavagu, Galeru River and Kundu River from Km 0.000 to Km 189.200 and Re-gradation of Vagu, flood Protection works and providing high level Bridges to en-route villages for improving the carrying capacity to 35000 cusecs. Administrative approval accorded for Rs 1415.00 Cr. VideG.O.RT. No.388 dt.15-07.2020. Benefits: ? Flood mitigation ? To overcome Inundation of Nandyal and Surrounding Villages. ? To carry flood water to Somasila Reservoir across Penna River in Nellore District, this serves ayacut of Nellore and Prakasham Districts and drinking water supply to Chennai city. ? To accommodate the flood at enroute villages at bridge locations by reconstructing high level bridges wherever necessary. ? Stabilizing KC canal ayacut.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data