logo

Nishat Chunian Power Project

Sector: Oil and Gas • Location: Pakistan

Source: World Bank Group

Project
Active

Nishat Chunian Power Limited (NCPL) was established as an unlisted public company with the purpose to build, own and operate a greenfield, heavy fuel oil-fired 200 MW independent power plant at Jamber Kalan, Tehsil Pattoki, District Kasur, Punjab Province.

Pakistan's Private Power and Infrastructure Board (PPIB) signed an Implementation Agreement (IA) with Nishat Chunian Power Limited (NCPL) on S

Status
Prospective
Sector
Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Nishat Chunian Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nishat Chunian Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Nishat Chunian Power Limited (NCPL) was established as an unlisted public company with the purpose to build, own and operate a greenfield, heavy fuel oil-fired 200 MW independent power plant at Jamber Kalan, Tehsil Pattoki, District Kasur, Punjab Province. Pakistan's Private Power and Infrastructure Board (PPIB) signed an Implementation Agreement (IA) with Nishat Chunian Power Limited (NCPL) on Sep. 15, 2007 for the implementation of the Nishat Chunian Power Project. NCPL is 80% owned by Nishat Chunian Limited (NCL). In turn, NCL is wholly owned by Nishat Group. In addition, NCPL has a fuel supply agreement with Shell Pakistan (signed December 2007), and a 25-year 'take-or-pay' power purchase agreement (PPA) with WAPDA (signed November 2007) that is backed by a sovereign guarantee from the Pakistani government. The total investment commitment made by the Nishat Group was US$235 million. PPIB reported that NCPL reached financial closure in January 2008. NCL was to finance Nishat Chunian Power Project partially through equity and partially through debt. The lenders for Nishat Chunian Power Project were a consortium of commercial banks including Habib Bank Limited (HBL), Allied Bank Limited (ABL), United Bank Limited (UBL), Standard Charted Bank (Pakistan) Limited (SCB) and Faysal Bank Limited (FBL) being Financial Advisor and Lead Arranger. As of Dec. 31, 2008, construction was underway and the project was expected to commence commercial operations by March 31, 2010. The project achieved commercial operations in July 2010. Private Power and Infrastructure Board, Nishat Group website: http://www.nctex.com/, Nishat Chunian Power Limited website: http://www.nishat.net/nishat_chunian.htm, Pakistan Daily Times http://www.ppib.gov.pk/N_nishatc.htm NOT THE SAME AS PROJECT 5059!

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project