NiSource 3 GW Power Generation and Grid Infrastructure Project
Planned · Indiana · Last reported Oct 2025
Source: Stock Titan
Quanta Services, in a 50% joint venture with Zachry, will design, procure, and construct generation and grid infrastructure capable of producing approximately 3 gigawatts of power for a large load customer. The project includes combined cycle gas turbines and phased delivery with full availability expected by 2032.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial
- Location
- Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about NiSource 3 GW Power Generation and Grid Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Quanta Services, in a 50% joint venture with Zachry, will design, procure, and construct generation and grid infrastructure capable of producing approximately 3 gigawatts of power for a large load customer. The project includes combined cycle gas turbines and phased delivery with full availability expected by 2032. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
