NISP Glade Unit CP2 - Munroe Canal Bypass
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Convert existing Munroe Canal from open channel to closed system through reservoir; 11,800 ft of 102 -in concrete encased welded steel pipeline through reservoir & right abutment; 90 -in welded steel pipe through two existing tunnels (1,300 ft and 3,700 ft); Parallel to 72" HLOW through right abutment
- Status
- Prospective
- Sector
- Tunnel, Steel, Water Supply and Storage, Cement, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NISP Glade Unit CP2 - Munroe Canal Bypass
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Convert existing Munroe Canal from open channel to closed system through reservoir; 11,800 ft of 102 -in concrete encased welded steel pipeline through reservoir & right abutment; 90 -in welded steel pipe through two existing tunnels (1,300 ft and 3,700 ft); Parallel to 72" HLOW through right abutment |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Tunnel, Steel, Water Supply and Storage, Cement, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
