NISPERO HYDRO VIII
One of 3,451 projects Taiyo tracks in Honduras.
Source: World Bank Group
The objectives of the project are to meet Honduran power load requirements which will exceed present generating capacity by 1980, to strengthen ENEE's management and planning capacity and to improve energy sector organization and planning. The project comprises the construction of the 22.5 MW Nispero hydroelectric plant, and the 30 MW Puerto Cortes diesel plant; studies of energy sector organizati
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Hydro
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NISPERO HYDRO VIII
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the project are to meet Honduran power load requirements which will exceed present generating capacity by 1980, to strengthen ENEE's management and planning capacity and to improve energy sector organization and planning. The project comprises the construction of the 22.5 MW Nispero hydroelectric plant, and the 30 MW Puerto Cortes diesel plant; studies of energy sector organization and ENEE's management system and organization, a national electrification master plan, preparation of a hydropower inventory updating, a prefeasibility study of the Piedras Amarillas hydro project, and a training program for ENEE. The project faces no special risks except for the complex geology of the Nispero hydro component site and the possibility of limited international contractor interest in this component because of its small size. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
