Nisswa Gull Lake Trail-Phase 4B
Sector: Water Supply and Storage • Location: Nisswa, Minnesota, United States of America
Source: Dodge
The Project includes the construction of approximately 0.45 miles of 10 foot wide bituminous trail, modular block retaining walls, culverts, and turf restoration. Some of the approximate quantities and items are the following: ITEM DESCRIPTION UNITS QUANTITIES Clearing & Grubbing TREE 7 Clearing & Grubbing ACRE 0.3 Common Excavation CU YDS 1100 2.5" Bituminous Trail Paving SQ YDS 24800 Modular Blo
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Car parking, Government, Mass Transit, Automotive
- Location
- Nisswa, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Nisswa Gull Lake Trail-Phase 4B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the construction of approximately 0.45 miles of 10 foot wide bituminous trail, modular block retaining walls, culverts, and turf restoration. Some of the approximate quantities and items are the following: ITEM DESCRIPTION UNITS QUANTITIES Clearing & Grubbing TREE 7 Clearing & Grubbing ACRE 0.3 Common Excavation CU YDS 1100 2.5" Bituminous Trail Paving SQ YDS 24800 Modular Block Retaining Wall SQ FT 4350 12", 15", and 24" RC Pipe LIN FT 230 12", 15", AND 24" RC Pipe Apron... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Nisswa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Car parking, Government, Mass Transit, Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
