logo

Nisutlin Bay Bridge

Sector: Cement • Location: Yukon, Canada

Source: Infrastructure Canada

Project
In Progress

Replacement of the Nisutlin Bay Bridge. The Bridge was constructed in 1953 by the Department of National Defence and is located in the Village of Teslin, at km 1242.7 on the Alaska Highway, 177km southeast of Whitehorse. The new bridge will be a 619m long two-lane bridge with a multi-use sidewalk and lighting. The bridge will have a concrete deck and eight piers. The bridge will be designed to mee

Status
Under Construction
Sector
Cement, Power Transmission, Bridge, Car parking, Road, Power Generation (CCGT), Government, Automotive
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Nisutlin Bay Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nisutlin Bay Bridge” is an infrastructure initiative in the Cement sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the Nisutlin Bay Bridge. The Bridge was constructed in 1953 by the Department of National Defence and is located in the Village of Teslin, at km 1242.7 on the Alaska Highway, 177km southeast of Whitehorse. The new bridge will be a 619m long two-lane bridge with a multi-use sidewalk and lighting. The bridge will have a concrete deck and eight piers. The bridge will be designed to meet the current design standard and the current load and lifeline seismic standard. Departmental Funding will go towards the: • Preconstruction Stage: planning, design engineering, geotechnical investigations, environmental permitting and assessment, public engagement and First Nations consultations; and • Construction Stage 1:mobilization, camp setup, utility works and construction of temporary structure (trestle bridge, production of granular materials, cofferdams and road approaches). Construction stages 2,3 and 4 to be funded by other funders.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Power Transmission, Bridge, Car parking, Road, Power Generation (CCGT), Government, Automotive

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project