Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the

Project Information FAQ

Project Information

5 Q
The project “Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the project is about 13.995 billion yuan. Second, Niu Tianyang Fast Track Project mainly include: roadbed engineering, pavement engineering, bridge and culvert engineering, cross engineering, traffic engineering and facilities along the route. The project contents of the West Extension Project of Jinsha West Road mainly include: road engineering, bridge and culvert engineering, traffic engineering, water supply engineering, rainwater engineering, sewage engineering, lighting engineering, cable trunking engineering, gas engineering, and greening engineering. The operation services of the Niu Tianyang Fast Track Project include daily maintenance and large and medium-sized repairs, which are composed of daily maintenance and maintenance, road maintenance, roadbed and drainage maintenance, bridge maintenance, lighting and electromechanical maintenance. Total project cost is $ 2.067 billions. The BOT concession has a duration of 20 years. Financial close took place on July 22, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8b6d894acb694f6fb2e41ab5194198fe

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data