Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Telecommunications, Waste Processing and Treatment, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the project is about 13.995 billion yuan. Second, Niu Tianyang Fast Track Project mainly include: roadbed engineering, pavement engineering, bridge and culvert engineering, cross engineering, traffic engineering and facilities along the route. The project contents of the West Extension Project of Jinsha West Road mainly include: road engineering, bridge and culvert engineering, traffic engineering, water supply engineering, rainwater engineering, sewage engineering, lighting engineering, cable trunking engineering, gas engineering, and greening engineering. The operation services of the Niu Tianyang Fast Track Project include daily maintenance and large and medium-sized repairs, which are composed of daily maintenance and maintenance, road maintenance, roadbed and drainage maintenance, bridge maintenance, lighting and electromechanical maintenance. Total project cost is $ 2.067 billions. The BOT concession has a duration of 20 years. Financial close took place on July 22, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8b6d894acb694f6fb2e41ab5194198fe |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Telecommunications, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
