logo

Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the

Status
Prospective
Sector
Water Supply and Storage, Bridge, Road, Telecommunications, Waste Processing and Treatment, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Niu Tianyang Fast Track and Jinsha West Road Xiyan Packing” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is divided into two sub-projects. First is the Niutian Ocean Expressway Project, and the other is Jinsha West Road West Extension (Guardian Road - Niutian Yang Expressway), Jidong Road, Aimin Road Road and supporting projects (hereinafter referred to as "Jinsha West Road West Extension Project") . According to the feasibility study report after the approval, the total investment of the project is about 13.995 billion yuan. Second, Niu Tianyang Fast Track Project mainly include: roadbed engineering, pavement engineering, bridge and culvert engineering, cross engineering, traffic engineering and facilities along the route. The project contents of the West Extension Project of Jinsha West Road mainly include: road engineering, bridge and culvert engineering, traffic engineering, water supply engineering, rainwater engineering, sewage engineering, lighting engineering, cable trunking engineering, gas engineering, and greening engineering. The operation services of the Niu Tianyang Fast Track Project include daily maintenance and large and medium-sized repairs, which are composed of daily maintenance and maintenance, road maintenance, roadbed and drainage maintenance, bridge maintenance, lighting and electromechanical maintenance. Total project cost is $ 2.067 billions. The BOT concession has a duration of 20 years. Financial close took place on July 22, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=8b6d894acb694f6fb2e41ab5194198fe

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Telecommunications, Waste Processing and Treatment, Government, Commercial

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project