NJ/DOT: Rt 23 Bridge Replacement (CO 131)
Sector: Water Supply and Storage • Location: West Milford, New Jersey, United States of America
Source: Dodge USA
Route 23, Bridge over Pequannock River/Hamburg Turnpike, Contract No. 017083470, Bridge Replacement, Grading, Paving, Drainage & Utilities, Township of West Milford, Passaic County; Boroughs of Kinnelon & Butler, Morris County Construction Inspection Services for: This project involves Bridge Deck Superstructure Replacement of Route 23 Northbound Bridge over the Pequannock River, structure No. 160
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Power Transmission, Road, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- West Milford, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NJ/DOT: Rt 23 Bridge Replacement (CO 131)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Route 23, Bridge over Pequannock River/Hamburg Turnpike, Contract No. 017083470, Bridge Replacement, Grading, Paving, Drainage & Utilities, Township of West Milford, Passaic County; Boroughs of Kinnelon & Butler, Morris County Construction Inspection Services for: This project involves Bridge Deck Superstructure Replacement of Route 23 Northbound Bridge over the Pequannock River, structure No. 1605174 at milepost 25.52. It is located on the border of West Milford Township, Passaic County and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | West Milford |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Power Transmission, Road, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
